splash dam
- splash dam的基本解释
-
-
临时挡水坝
- 相似词
- 更多 网络例句 与splash dam相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
Although forest canopy layer could prevent splash erosion effectively, clay was taken away by overland flow and run off easily, the erosion amount became less after removing the forest canopy and surface soil, while the splash erosion still produced in the surface layer; the splash function weakened after having water current, the starting particles were less than bareland, so removing the surface disturbed soil made the erosion amount and clay less, silty sand more than bareland, but unsteady, the wear and tear energy used by raindrop splash and current function for overcoming sediments separating and starting were comparatively large, sediments were very difficult to be started and transported, it explained that forest root systems could increase anti-erosion capability of forest vegetation, make rainfall-current system splash and export finer particles than bareland.
虽然林冠层能有效防止溅蚀的发生,但坡面流还是能带走粘粒部分,粘粒还是容易流失。去除林冠和表层土后,侵蚀量变得更少,但表层还是会被溅蚀,有水流后,溅蚀作用减弱,颗粒起动的比裸地的少,所以,去除表层扰动土后,侵蚀量更少,粉沙多,粘粒比裸地更少一些,但不稳定,雨滴击溅和水流作用用于克服泥沙分离起动损耗的能量较大,很难被起动输移,这说明森林植被根系的作用增加了林地植被的抗蚀力,使降雨一水流系统仅能溅起输出比裸地坡面更细小的泥沙颗粒。
-
With the increasing of the overburden layer thickness or the dam height, the maximum value of response acceleration in dam body assumes gradually decrease, and its characteristic distribution is uniformization, and the response acceleration of the dam slopes decrease remarkably, and response acceleration of the dam top is less than the dam bottom.With the decreasing of the overburden layer thickness, the dam foots and their nearby soil response acceleration get increasing.
随着覆盖层厚度增大或坝高增大,坝体中的反应加速度最大值分布具有逐渐递减、均匀化的变化特征;坝坡体的反应加速度递减显著的变化特征,坝顶反应加速度较坝底反应加速度小的特征;覆盖层厚度越小,坡脚及其附近土体的反应加速度越大的特征。
- 更多网络解释 与splash dam相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Splash dam:积水坝
酒精水准器 Spirit-level | 积水坝 Splash dam | 夹接板(轨条) Splice bar