site test
- site test的基本解释
-
-
现场试验, 当场试测, 实地试验
- 拼写相近词组、短语
- site testing
- 更多网络例句与site test相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Based on model test in the laboratory and site test, a blasting effect is achieved.
在实验室进行模型试验的基础上进行了现场试验,并取得了较好的爆破效果。
-
Some methods aiming at the two problems have been researched. First, the optimal number of ATE site can be calculated based on a cost model of DAT-ATE. Second, the problem of test schedule which is equitant with two-dimensional Bin-Packing problem is presented. Then a TCG denotation satisfied with T-admissible rule is more convenient for combinational optimization. With Simulated annealing algorithm, better test scheduling results can be achieved; but there is no great optimization space because the efficiency of scheduling is greater than 90%. Third, A novel test compression method——Multi-capture testing is proposed to compress the stimuli. And the ATPG results show that MC achieves high compression ratio which is greater than 90% in some large-scale circuits. MISR, widely used in LBIST, is employed to compress the responses. The aliasing analysis demonstrates that the fault coverage reduction is little due to the existence of aliasing. Fourth, an improved TIC (called S-TIC) aiming at structured test is proposed based on ARM's TIC. A MC scheduling algorithm is proposed to compute the SoC test time and combine MC vectors to SoC test vectors. The scheduling results shows that test time is greatly reduced when using the proper scheduling priority.
首先,给出了低成本ATE的成本模型,根据此模型得到最低测试成本时系统级测试调度的基本参数——测试Site数;其次,本文将DAT-Scan方式的SoC测试调度等价为两维BP问题,为有效地求解该问题,将该BP问题表示为TCG图并通过模拟退火算法解决其求解过于复杂的问题,调度的结果表明该方法在测试时间上有一定改善,并指出DAT-Scan测试调度效率已经大于90%,进一步优化的空间较小;第三,本文尝试通过测试压缩来解决激励所需的测试带宽,提出了Multi-capture结构并解决了MC测试过程中的&矢量&退化问题,MC测试的ATPG结果表明其测试压缩率很高(大电路接近90%);第四,在激励获得很高压缩比的情况下,测试响应也需压缩,本文采用LBIST中常用的MISR作为MC测试的响应压缩电路,理论分析和实验结果都证明了MC测试的别名对故障覆盖率影响较小(小于2%),并对两类别名的成因做了具体分析;第五,在MC测试及其响应压缩的基础上,本文改进了ARM公司的测试控制器TIC使之适合于MC测试,为了解决MC测试矢量合成问题,本文抽取了MC测试模型,通过固定优先级的MC测试调度模拟将MC矢量合成为ATE矢量,并模拟出了总的MC测试时间。
-
Based on the results of exploration and in-site test of typical waste dump in southwest mountainous area,the analysis theory and method of waste dump rainfall infiltration are discussed beginning at analysing coal waste's mechanics characteristic and seepage theoty. Fllowed estimating method of waste dump stability is discussed influenced by rainfall. At last a typical engineering example of coal waste dump landslide influenced by rainfall is researched, acquiring research fruit hereinafter.①Particular exploration of typical waste dump in chongqing area and analysis estimate to its area engineering geology are done. Granule gradation、water content、nature density、dry densit etc parameter of waste granular media are tested. The mechanics characteristic of waste are researched by in-site shear experimentation、compressibility experimentation and infiltration experimentation.②The coal waste dumping is different from other consecutive solid material as incompact granule structure. Its shear strength and transforming characteristic also have itself characteristic.
本文针对山区矸石山,结合踏勘和现场试验,从分析矸石散体的力学特性以及渗流理论出发,研究了矸石山降雨入渗的分析理论与方法,在此基础上提出了矸石山体降雨作用下的稳定性评价方法,最后进行了降雨作用下典型矸石山滑坡工程实例研究,取得了以下研究成果:①对重庆山区中梁山、万盛、荣昌、天府、綦江等矿区代表性的矸石山进行详细踏勘,对矸石山的堆放形态及其区域的工程水文地质情况进行调查;针对重庆山区矸石山,测试矸石散体的颗粒级配、含水量、天然密度、干密度等参数、并在此基础上,通过现场剪切、压缩、渗透试验等研究矸石散体的力学特征。
- 更多网络解释与site test相关的网络解释 [注:此内容来源于网络,仅供参考]
-
on-site test:实地测试;现测试
on-site inspection 实地调查;现调查 | on-site test 实地测试;现测试 | on-street parking space 路旁泊车位
-
on-site test:现场试验
on site repair 现场修理 | on site test 现场试验 | on site trial 现场试验
-
on-site test:实地测试;现场测试
on-site inspection 实地调查;现场调查 | on-site test 实地测试;现场测试 | on-street parking space 路旁泊车位