英语人>词典>英汉 : replacement cost的中文,翻译,解释,例句
replacement cost的中文,翻译,解释,例句

replacement cost

replacement cost的基本解释
-

[化] 更换成本

相似词
更多 网络例句 与replacement cost相关的网络例句 [注:此内容来源于网络,仅供参考]

A univariate ANOVA is executed to analyze the influencing factors of the production cost by dividing it into direct material, direct labor cost, indirect cost and total cost separately. It is found that the variables of farm scale and crop type show significant impacts in the direct labor cost and total production cost. The one-crop farming variable makes significant difference in the total production cost; whereas different planting ways differentiates the indirect cost. In addition, years of farming, farmer's age, and full-time status all make no significant difference in all aspects of production cost.

此外,将农场生产成本分为直接材料、直接人工、间接成本、总生产成本四面向进行多因子变异数分析,结果发现耕作面积、作物类型变项仅在有机农场的直接人工和总生产成本中有显著差异;有机农场是否为单一经营在总生产成本上有显著差异;不同栽培方式的有机农场仅在间接成本的高低上有显著差异;此外,而耕作年数变项因本研究有机农场耕作年数较高之样本特性影响,导致该变项对生产成本并无显著的差异;年龄、专兼业经营等变项在生产成本上高低并无显著差异。

The chapter four to chapter eight analyze the railway engineering cost making standard from the sides respectively including railway engineering quotation, railway quotation direct cost, site administration cost, construction measurement cost, indirect cost and profit, analyze the key factor which influencing cost, confirm the scientificity and rationality of the current cost making standard basing on field measuring data, bring forward the advise of the ways and method of reducing invest and cost, and bring forward the opinion and advice for improve and perfect the current railway cost making standard.

第4~8章分别从铁路工程定额、铁路定额直接费、现场管理费、施工措施费、间接费和利润等方面对铁路工程造价计价标准进行分析,分析影响费用的关键因素,依靠实测数据检验现行各项计价标准的科学性与合理性,提出降低投入、减少成本支出的途径和方法的建议,并对现行铁路计价标准提出改进和完善的意见和建议。

An image forming apparatus, provided with replacement parts each having a storage section therein and adapted to be detachably attached to the image forming apparatus and with an image forming unit arranged to form an image on a printing medium, includes: an information reading section that reads information from the storage section of at least one of the replacement parts; a certified part determining section that determines whether the replacement part is a certified part or not based on the information read from the storage section; and an image forming possibility determining section that determines whether or not image forming is possible using the replacement part determined to be a certified part by the certified part determining section.

一种成像设备,其配备有:替换零件,每个所述替换零件其中具有一个存储部分,并且适于被可拆地配属到所述成像设备上;以及成像单元,所述成像单元被安排用于在打印介质上形成图像,所述成像设备包括:一个信息读取部分,该信息读取部分从至少一个所述替换零件的存储部分读取信息;检定零件确定部分,根据从所述存储部分读取的信息,该检定零件确定部分确定所述替换零件是否是已检定零件;以及成像可能性确定部分,用于确定使用被所述检定零件确定部分确定为已检定零件的所述替换零件是否能够成像。

更多网络解释 与replacement cost相关的网络解释 [注:此内容来源于网络,仅供参考]

replacement cost:重置成本

人力资本的成本计量可以从对人力资本价值的投入的角度来确认和计量,也就是人力资本价值的成本计量模式. 人力资本成本包括原始成本(Original Cost)、重置成本(Replacement Cost)、机会成本(Opportunity Cost)和边际成本(Marginal Cost)组成.

replacement cost:重置费用

inventory carrying costs-存货占用成本 | replacement cost-重置费用 | money market-货币市场

replacement cost:重置成本;更新成本;迁建费用

rephasing of expenditure 重新订定分期拨付开支的时间 | replacement cost 重置成本;更新成本;迁建费用 | replacement reserve 重置储备金;更新储备金

replacement cost:现行成本 Current cost 重置成本

历史成本 Historical cost 现行价值会计 Current value accounting | 现行成本 Current cost 重置成本 Replacement cost | 物价指数 Price-level index

market replacement cost:市场重置成本

market quotation 市场行情 | market replacement cost 市场重置成本 | market research 市场调查,市场研究

加载更多网络解释 (9)