- 更多网络例句与pyrostatic相关的网络例句 [注:此内容来源于网络,仅供参考]
-
It is advisable to compute shale and tuff content in pyrostatic sedimentary reservoir using statistical method, its average relative error is 9.6% and 11.5%, which lays a foundation for next reservoir evaluation.
统计法在火山碎屑沉积岩储层中取得了较好的应用效果,其平均相对误差分别为9.6%和11.5%,为下一步开展储层评价奠定了基础。
- 更多网络解释与pyrostatic相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Pyrostatic Pillar:电焰柱
99Misguided Rage歧途怒火SC | 100Pyrostatic Pillar电焰柱SC | 101Rock Jockey落岩操纵手SC