meet an emergency
- meet an emergency的基本解释
-
-
应急, 应变
- 更多网络例句与meet an emergency相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Crisis management meet an emergency as discussion, sum up and is it discuss and make conclusion and suggestion to analyse, is it make in the future dealing with similar masses activity resist crisis, conflict of incident manage reference that meet an emergency to support.
本研究主要探讨保安警察第X大队处理群众活动,对冲突情境「三案件」等议题出发,以民意代表或政党等人士介入抗争冲突对保安警察危机管理的应变之影响与保安警察面对抗争冲突,有关冲突情境、沟通协调、危机管理的事前、事中及事后准备与处置等问题为核心,访问协勤高雄市之保安警察第X大队员警处理群众活动面对冲突情境等议题时,保安警察对冲突之处置,在事前准备、事中处置、事后处理等危机管理应变作为之探讨,归纳与分析讨论并作成结论与建议,供作今后处理类似群众活动抗争冲突事件之危机管理应变之参考。
-
At a word, the aim is: get across information technology to conformity resource for all company, to realize innovation in organization management, operation, service, to distend in lower cost, to buildup ability in anti-risk, to build quick response mechanism and expedite communicate channel, to advance adaptive ability and meet an emergency ability to the circumstance, and construct an attach most importance to clients and oriented to market company system.
简而言之,这个目标就是:整合公司的整体资源,实现组织管理创新、业务创新、服务创新,实现低成本扩张,增强抗风险能力,建立快速反应的运行机制,建立通畅的沟通渠道,提高对环境的适应能力、应变能力,建设以客户为中心、以市场为导向的公司体系结构。
-
The result makes clear: EThe tensile strength of TFE film increases somewhat along with the addition of drawing speed, and rupture outspread rate reduces;ETFE to succumb filmily somewhat along with the addition of drawing speed the addition that intensity follows drawing rate and increase somewhat, but the 2nd succumb intensity increases not big;ETFE to succumb filmily meet an emergency follows drawing rate increase somewhat, the 2nd succumb the amount of tangent and stretch model that meet an emergency reduces;ETFE film somewhat and model of the 2nd flexibility measure those who follow drawing rate to increase show downtrend, quantity of secant flexibility model and quantity of the 3rd stretch model do not have apparent change.
结果表明:ETFE薄膜的抗拉强度随拉伸速度的增加略有增加,而断裂延伸率随拉伸速度的增加略有减小;ETFE薄膜的屈服强度随拉伸速度的增加而有所增加,但第二屈服强度增加不大;ETFE薄膜的屈服应变随拉伸速度的增加略有增加,第二屈服应变则略有减少;ETFE薄膜的切线弹性模量以及第二弹性模量随拉伸速度的增加呈下降趋向,割线弹性模量和第三弹性模量则没有明显的变化。
- 更多网络解释与meet an emergency相关的网络解释 [注:此内容来源于网络,仅供参考]
-
track meet:相关词的翻译
Track Meet的翻译: | Track Meet相关词的翻译: | 应急:meet an emergency