master production schedule
- 更多网络例句与master production schedule相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Coordinate with production lines and other related departments on Master Production Schedule and operation production plan.
与生产线及相关部门协调主生产计划及操作计划。
-
To master production schedule and production plan for the completion, audit all relevant production statements.
掌握生产进度和生产计划完成情况,审核上报的相关的各项生产报表
-
Plan and maintain proper levels of material to execute the master production schedule.
与生产计划合作,按照周计划的安排提供预订的物料可用性,来满足及稳定全球物料预订的委托
-
3 Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
-
2 Compare Master Production Schedule with Customer PO coverage on regular basis to avoid material exposure.
定期比较主生产计划和客户订单,以避免物料闲置。
- 加载更多网络例句 (23)
- 更多网络解释与master production schedule相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Master Production Schedule:主生产计划
名词解释 主生产计划(Master Production Schedule): 关键零部件或产品(对公司利益影响重大或消耗关键资源的物料)的生产计划. MPS 要回答的问 题是:要制造什么具体物料?多少?何时?存在什么能力制约?存在什么物料约束? 在计划相关零部件和采购件之前,
-
Master Production Schedule:主生产排程
61 MO 制令 Manufacture Order | 62 MPS 主生产排程 Master Production Schedule | 63 MRO 请修(购)单 Maintenance Repair Operation
-
MPS Master Production Schedule:主生产计划
78 MIS Management Information System 管理信息系统 | 79 MPS Master Production Schedule 主生产计划 | 80 MRP Material Requirements Planning 物料需求计划
-
MPS Master Production Schedule:主要生产排期计划
MC: Management Centre 管理中心 | MPS: Master Production Schedule 主要生产排期计划 | NCR: Non Conformance Report 不符合项报告
-
MPS Master Production Schedule:主生产排程
MPEG Motion Picture Experts Group 運動圖像專家組(圖聲標准) | MPS Master Production Schedule 主生產排程 | MQE Manufacturing Quality Engineer 製造品質工程