indirect cost
- indirect cost的基本解释
-
-
间接成本
- 相关歌词
- The Warriors
- Jesus Saves
- 相关中文词汇
- 间接成本
- 更多网络例句与indirect cost相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This article analyses the main process of quoting at hydropower project,claims the problems should be paid attention to,and concludes the requirements for a budgeteer,on the basic of the ingredients of total,which is the sum of all the products of quantity and rate consisted by labor cost,material cost,machine cost,other direct cost,indirect cost,profit and tax.
分析了水利水电工程投标报价的主要步骤,提出了报价中应注意的问题,总结了做好报价工作的要求。
-
A univariate ANOVA is executed to analyze the influencing factors of the production cost by dividing it into direct material, direct labor cost, indirect cost and total cost separately. It is found that the variables of farm scale and crop type show significant impacts in the direct labor cost and total production cost. The one-crop farming variable makes significant difference in the total production cost; whereas different planting ways differentiates the indirect cost. In addition, years of farming, farmer's age, and full-time status all make no significant difference in all aspects of production cost.
此外,将农场生产成本分为直接材料、直接人工、间接成本、总生产成本四面向进行多因子变异数分析,结果发现耕作面积、作物类型变项仅在有机农场的直接人工和总生产成本中有显著差异;有机农场是否为单一经营在总生产成本上有显著差异;不同栽培方式的有机农场仅在间接成本的高低上有显著差异;此外,而耕作年数变项因本研究有机农场耕作年数较高之样本特性影响,导致该变项对生产成本并无显著的差异;年龄、专兼业经营等变项在生产成本上高低并无显著差异。
-
The chapter four to chapter eight analyze the railway engineering cost making standard from the sides respectively including railway engineering quotation, railway quotation direct cost, site administration cost, construction measurement cost, indirect cost and profit, analyze the key factor which influencing cost, confirm the scientificity and rationality of the current cost making standard basing on field measuring data, bring forward the advise of the ways and method of reducing invest and cost, and bring forward the opinion and advice for improve and perfect the current railway cost making standard.
第4~8章分别从铁路工程定额、铁路定额直接费、现场管理费、施工措施费、间接费和利润等方面对铁路工程造价计价标准进行分析,分析影响费用的关键因素,依靠实测数据检验现行各项计价标准的科学性与合理性,提出降低投入、减少成本支出的途径和方法的建议,并对现行铁路计价标准提出改进和完善的意见和建议。
- 更多网络解释与indirect cost相关的网络解释 [注:此内容来源于网络,仅供参考]
-
间接成本汇总 Indirect Costs 间接成本:Indirect Cost Pools
Indirect Cost 间接成本 | Indirect Cost Pools 间接成本汇总 Indirect Costs 间接成本 | Indirect Project Cost 间接项目成本 Individual 个体
-
indirect cost:间接成本
成本与成本对象直接或间接相关,间接成本(indirect cost)是不容易精确地追溯到成本对象的成本,直接成本(direct cost)是那些易于精确地追溯到成本对象的成本.
-
indirect cost:间接费用
indirect construction cost 间接工程费用 | indirect cost 间接费用 | initial cost 基建费用,初期费用