framed dam
- framed dam的基本解释
-
-
框架坝
- 相似词
- 更多 网络例句 与framed dam相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
With the increasing of the overburden layer thickness or the dam height, the maximum value of response acceleration in dam body assumes gradually decrease, and its characteristic distribution is uniformization, and the response acceleration of the dam slopes decrease remarkably, and response acceleration of the dam top is less than the dam bottom.With the decreasing of the overburden layer thickness, the dam foots and their nearby soil response acceleration get increasing.
随着覆盖层厚度增大或坝高增大,坝体中的反应加速度最大值分布具有逐渐递减、均匀化的变化特征;坝坡体的反应加速度递减显著的变化特征,坝顶反应加速度较坝底反应加速度小的特征;覆盖层厚度越小,坡脚及其附近土体的反应加速度越大的特征。
-
In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.
本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。
- 更多网络解释 与framed dam相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Framed mirror:有框镜
framed heel nylon stockings 后跟加深色线条尼龙长袜 | framed mirror 有框镜 | framed saw 架锯
-
framed building:构架建筑
framed bent 框架桥台 | framed building 构架建筑 | framed connection 构架结合
-
framed partition:构架隔断
framed mattress 木框式沉排 | framed partition 构架隔断 | framed revetment 框架式挡土墙,框架式护岸