face cleat
- face cleat的基本解释
-
-
面割理
- 相关歌词
- Check The Technique
- 相关中文词汇
- 面割理
- 更多网络例句与face cleat相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The results show that the methane drainage quantity from the bores perpendicular to face cleat was 1.2 times that of the bores parallel to face cleat in any time and the difference between them becomes more distinct with the drainage time increasing. In the research area, the bores perpendicular to the face cleat was 2.61 times that of the bores parallel to face cleat in maximum drainage quantity and 4.34 times that in drainage effect, and the reasonable time is about 300 days.
结果表明:垂直面割理方向钻孔的抽放量在任何时刻都明显高於平行面割理方向钻孔的抽放量,抽放时间越长,两方向抽放量之间差距越显著;研究区垂直面割理方向钻孔的极限抽放量是平行面割理方向钻孔的2.61倍,抽放率高出4.34倍,合理抽放时间在300d左右。
- 更多网络解释与face cleat相关的网络解释 [注:此内容来源于网络,仅供参考]
-
face cleat:割理面
割理 cleat | 割理面 face cleat | 割裂 gash fractures
-
face cleat:面割理
face clearance ==> 铣刀端面后角 | face cleat ==> 面割理 | face cloth ==> 方巾
-
face cleat:正割目;正割理
"face-centred cubic","面心立方体" | "face cleat","正割目;正割理" | "face concentration","工作面集中率"
-
cleat face:劈理面
clearway 超高速公路 | cleat face 劈理面 | cleat 楔子