defects liability period

defects liability period的基本解释
-

保修期

更多网络例句与defects liability period相关的网络例句 [注:此内容来源于网络,仅供参考]

1 In the event of a Subcontractor having undertaken towards the Contractor in respect of the work executed; or the goods, materials, Plant or services supplied by such Subcontractor, any continuing obligation extending for a period exceeding that of the Defects Liability Period under the Contract, the Contractor shall at any time, after the expiration of such period, as sign to the Employer, at the Employer's request and cost, the benefit of such obligation for the unexpired duration thereof

14.1 当分包商在所进行的工作,或其提供的货物、材料、工程设备或服务等方面,为承包商承担了合同规定的缺陷责任期限结束后的任何延长期间须继续承担的任何连续义务时,承包商在根据雇主的要求和由雇主承担费用的情况下,在缺陷责任期满之后的任何时间,将上述未终止的此类义务的权益转让给雇主。

B. execute all such work of amendment, reconstruction, and remedying defects, shrinkages or other faults as Engineer may, during the Defects Liability Period or within 14 days after its expiration, as a result of an inspection made by or on behalf of the Engineer prior to its expiration, instruct the Contractor to execute.

按工程师的要求或以工程师名义在缺陷责任期满之前进行检查后,指示承包商修补、重建和补救缺陷、收缩或其它毛病时,承包商应在缺陷责任期内或期满后的14天内实施工程师可能指示的上述所有工作。