- 更多网络例句与cruciality相关的网络例句 [注:此内容来源于网络,仅供参考]
-
DM Baillie, God Was in Christ; K Barth, The Doctrine of Reconciliation; E Brunner, The Mediator; H Bushnell, The Vicarious Sacrifice; JM Campbell, The Nature of the Atonement; S Cave, The Doctrine of the Work of Christ; RW Dale, The Atonement; FW Dillistone, The Significance of the Cross; J Denney, The Death of Christ and The Christian Doctrine of Reconciliation; RS Franks, The Work of Christ; PT Forsyth, The Cruciality of the Cross and The work of Christ; L Hodgson, The Doctrine of the Atonement; TH Hughes, The Atonement; J Knox, The Death of Christ; RC Moberly, Atonement and Personality; J Moltmann, The Crucified God; L Morris, The Apostolic Preaching of the Cross and The Cross in the NT; RS Paul, The Atonement and the Sacraments; V Taylor, Jesus and His Sacrifice and The Atonement in NT Teaching; LW Grensted, A Short History of the Doctrine of the Atonement; R Wallace, The Atoning Death of Christ.
马克baillie ,上帝在基督里; k巴特,这个学说的和解;电子布兰,调解员; h布什内尔,替代牺牲; jm坎贝尔,但性质赎罪; s洞窟,中庸的工作,基督; rw戴尔,赎罪; FW的dillistone ,十字架的意义; j ,丹尼,死亡的基督和基督教教义的和解;卢比弗兰克斯,这项工作的基督;铂佛塞斯, cruciality的十字架上的工作,基督;升,惠普,这个学说的赎罪;次休斯,赎罪; j诺克斯,死亡的基督;钢筋moberly ,赎罪和人格; j莫特曼,被钉十字架的上帝;升莫里斯,教廷鼓吹的交叉和跨中新台币;卢比保罗,赎罪和圣礼; v泰勒,耶稣和他的牺牲和赎罪在新台币教学; LW的格伦斯特德,历史较短的学说赎罪与r华莱士, atoning死亡的基督。
-
In project risk management, the significations and algorithms of Activity Cruciality Index, Reference Point Completion Probability and project period risk in Petri Nets are studied.
系统地研究了工序进度风险水平、工期风险等指标在Petri网中的含义和计算方法。
-
Network planning ; Monte carlo simulation; Schedule risk ; Project duration ; Activity criticality probability; Activity cruciality index
网络计划;蒙特卡洛仿真;进度风险;项目总工期;工序关键概率;工序关键指标
-
The defect of the plan would have been uncovered before the crisis comes if Exson had done some dry run of the plan and made all the crew knew clearly the seriousness and cruciality of the leakage.
如果埃克森公司以前曾做过危机模拟试验的话,并使全体船员熟知危机情况的严酷性和重要性,计划本身的缺点在真正的危机发生之前就应该被发现了。
-
By introduction of two key indexes for risk evaluation,i.e.the activity criticality index and cruciality index and adoption of 0??1 integer programming algorithm,a resource reallocation model and a calculating method were established for time-resources tradeoffs of PERT resource-constrained scheduling.An application program according to the function of tradeoff algorithm was complied by use of Delphi 7.0 and Lindo software.
针对资源限制下PERT施工进度计划的工期资源优化问题,引进评价风险量的关键指标———活动关键度指标和重要度指标,采用0-1整数规划技术,建立资源配置优化模型以及优化计算方法;运用Delphi7.0和Lindo工具,开发了该方法的应用程序,并结合实例进行了应用。
- 加载更多网络例句 (2)