英语人>词典>英汉 : cross banding的中文,翻译,解释,例句
cross banding的中文,翻译,解释,例句

cross banding

cross banding的基本解释
-

频率交联, 交叉结合, 交叉排列

更多网络例句与cross banding相关的网络例句 [注:此内容来源于网络,仅供参考]

Steel banding before the foundation set in the center of the cushion, and cross through the center axis for vertical and horizontal, and then through the center ring for radiation tendons and tendon distance and ring the number.

钢筋绑扎前,先在垫层上定出基础中心点,并通过中心点定出纵横十字轴线,再通过中心点定出辐射筋和环筋的距离和环数。

One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

更多网络解释与cross banding相关的网络解释 [注:此内容来源于网络,仅供参考]

crossband transponder:交叉频带发送机

交叉频带的 crossband | 交叉频带发送机 crossband transponder | 频率交联,交向排列 cross-banding