covering transformation
- covering transformation的基本解释
-
-
覆盖变换
- 更多网络例句与covering transformation相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Deloitte Consulting is uniquely positioned to provide services in all aspects of enterprise transformation covering strategy, design,implementation and support services.
税务与商务咨询部我们是一支由高质素的税务专业人士组成的团队,致力于为各类型的跨国、地区和本地企业以及高资产人士和在中国工作的外籍人员提供专门化的税务合规和顾问服务。
-
Products include PLC, Touch Panel, VVVF, AC servo system, power distribution control, numerical control systems, but also to the field of enterprise customers tip of technical services, technical engineering staff of the PLC, Touch Panel, inverter, servo , step, such as automation and control systems, has a wealth of practical experience in engineering, a lot of companies have successfully carried out for the system design and technical transformation projects, covering machine building, metallurgy, textile, printing and dyeing, paper making and printing, food processing, water treatment and other industries to provide better and more efficient services.
产品包括PLC、触摸屏、变频调速器、交流伺服系统、配电控制产品、数控系统,同时也向该领域企业客户提供先端的技术服务,公司技术工程人员对PLC、触摸屏、变频器、伺服、步进等自动化控制系统等,有着丰富的实际工程经验,先后为很多公司成功进行系统设计和技术改造等项目,范围涉及机械制造、冶金、纺织、印染、造纸及印刷、食品加工、水处理等行业,提供更好、更快的服务。
-
There are two problems,the first is the fact that its natural covering under the self-affine transformation is not a efficient covering, the second is the fact that the limiting frequency of some digits or fibers may not exit.
其困难在于由于其仿射背景,导致它们的自然覆盖不是一个有效的覆盖,以及某些点或纤维的频率可能不存在导致维数估计的困难。
-
Take full account of the new sections of road to airport planning and coordination, as far as possible around the power to avoid a number of important facilities and buildings, then the original starting point for North and South Airport Road, north along the river channel distribution, the end of Station Road in the South and水泊provincial highway 804 phase, line length of 1763 meters, the road净宽24.5 meters, two-way four-lane, according to a standard design the construction of the road;水泊transform large sections of Interchange Interchange ramp and a long range of 1000 meters of the 804 provincial highway, the section of the transformation works for Covering 44,000 square meters of the road.
新建路段充分考虑路线走向与机场规划的协调,尽量绕避一些重要的电力设施和建筑物,起点接原机场南北路,向北沿河道展布,终点在大水泊公路站南与804省道相接,线路总长1763米,路面净宽24.5米,双向四车道,按一级路标准设计建造;改造路段为大水泊互通立交匝道和立交范围内长1000米的804省道,该路段改造工程为44000平方米的路面罩面。
- 更多网络解释与covering transformation相关的网络解释 [注:此内容来源于网络,仅供参考]
-
covering transformation:覆盖变换
covering theorem of heine borel 海湟 波莱尔的覆盖定理 | covering transformation 覆盖变换 | cramer formula 克莱姆公式
-
covering transformation group:覆盖变换
正则覆盖:normal covering | 覆盖变换:covering transformation group | 复合形法:covering complex method