contractor ['kɔntræktə]
- contractor的基本解释
-
n.
立契约的人, 承包商
- The contractors from both sides have executed the documents.
- 契约双方都已在文件上签了字。
- The flooring and landscaping will be done by contractors.
- 地板铺设和室外美化将由承包人来做。
- 相似词
- 相关歌词
- Girlie Girlie
- Drama A/T
- Poet Laureate Infinity V003
- Poet Laureate Infinity Vocal 5
- Nobody Loves A Riveter
- Yo Cats
- 拼写相近单词
- contractors
- contractor所属的单词分类
-
Job & Occupation / 工作与职业
[298]
highway patrol · football player · cab driver · security guard · truck driver · quilter · park ranger · garbage man · zoologist · zookeeper
- 更多 网络例句 与contractor相关的网络例句 [注:此内容来源于网络,仅供参考]
-
At end of each mouth the Contractor shall deliver to the Engineer a priced statement of the labour, materials and the Contractor's Equipment, except as aforesaid, used and the Contractor shall be not entitled to any payment unless such lists and statements have been fully and punctually rendered. Provided always that if the Engineer considers that for any reason the sending of such lists or statements by the Contractor, in accordance with the foregoing provision, was impracticable he shall nevertheless be entitled to authorize payment for such work, either as daywork, on being satisfied as to the time employed and the labour, materials and Contractor's Equipment used on such work, or at such value therefore as shall, in his opinion, be fair and reasonable.
每个月末,承包人应向工程师送交一份不包括上段内容的所用劳务,材料,承包人的机械设备并标有价格的结帐清单,如承包人未能将此结帐单与报表开列齐全,准时提交,则承包人无权获得任何款项,但是如工程师认为按上述规定,承包人的清单和结帐单的呈报由于任何原因而实际无法做到,则工程师仍然有权核准此等工作款项,该项款项或按计日工计算(工程师必须对该工程所雇的劳力,时间,所用的材料和承包人的设备情况表示满意)或按工程师认为公平合理的该项工程的价值计算。
-
Now the Condition of the above-written Guarantee is such that if the Contractor shall duly perform and observe all the terms provisions conditions and stipulations of the said Contract on the Contractor's part to be performed and observed in accordance with the true purport intent and meaning thereof or if on default by the Contractor the Guarantor shall satisfy and discharge the damages sustained by the Employer thereby up to the amount of the above-written Guarantee then this obligation shall be null and void but otherwise shall be and remain in full force and effect but no alteration in terms of the said Contractor or in the extent or nature of the Works to be executed, completed and defects in the Works remedied thereunder and no allowance of time by the Employer of the Engineer under the said Contract nor any forbearance or forgiveness in or respect of any matter or thing concerning the said Contract of the part of the Employer or the said Engineer shall in any way release the Guarantor from any liability under the above-written Guarantee.
现在在之上书面保证的条件是这样如果承包商将执行和适当地将观察前述合同的所有期限供应条件和规定在承包商的零件执行和被观察与真实的主旨意向符合和意思因此或如果在缺省由承包商保人将满足和将释放损失由雇主遭受因此由相当数量在之上书面保证决定然后这义务将是除消并作废的但否则将是和将依然是在充分的力量和作用但没有改变根据前述承包商或在工作被执行,被完成和瑕疵的程度或本质在工作由工程师的雇主补救在其下和没有任一件问题或事容限时间根据前述合同亦不任一忍耐或饶恕或尊敬关于雇主或前述工程师的部份的前述合同在任何情况下发行将保人从任一个责任在在之上书面保证之下。
-
Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.
如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。
- 更多网络解释 与contractor相关的网络解释 [注:此内容来源于网络,仅供参考]
-
contractor:承包商
(4)"承包商"(Contractor)系指个人、行号或公司,为履行契约工程或工作之承包厂商,其投标已被接受并经双方签字者,承包商包括其代表人. (5)"工程司"(Engineer)系指主办机关以书面指派行使本契约所赋予之工程司之职权者.
-
contractor:承包人
伯克利分校校友会共有工作人员87人,其中全日制工作人员为51人;部分时间工作人员(Part-time)为24人;临时雇员(Temporary Employee)为9人,承包人(Contractor)为3人.
-
contractor:合同工
主题:合同工(contractor)和正式工有什么区别?合同工(contractor)和正式工有什么区别?
-
contractor:承包方
我们想从交易成本经济学的几个基本概念来分析企业的外包关系的构建,尤其我们会探讨资产专用性如何会影响发包方(Buyer)与承包方(Contractor)的力量对比,继而影响发包方的最后目标实现(也即降低成本).
-
general contractor:总承包商
在一般情况下形成\"CFS\"文件后即可进行对总承包商(General Contractor)的邀请招标. 但如果在一个地区已有较成熟的工程实例的话,那么除了以上这些重要文件外也可能包含部分图纸或BOQ(工程量清单).
- 加载更多网络解释 (17)