coking tower
- coking tower的基本解释
-
-
焦炭塔, 焦化塔, 炼焦塔
- 更多网络例句与coking tower相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Through analysis of the components of coking on different parts of desullfur system of single tower and the waste water containing sulfur , we find the cause of coking in the stripping desulur system from single tower is the polymerization reaction of carbohydrate and the separattion of varied solid powders, organic compounds, and all corrosive productions of metal out of waste water in high temperature, therefore,the solving method is how to decrease the oil content ,how to depolymerize form the carbohydrate and how to antisepticize by vapour of waste water.
对单塔脱硫系统中不同部位的垢物及现场催化含硫污水进行了分析测定,结果表明:塔内污垢成分及含量随塔体部位的不同而不尽相同,单塔汽提脱硫系统中垢物的形成,主要是由于污水中所含各类粉尘、有机物、金属腐蚀物等在高温下因石油碳氢化合物的析出及其单体的聚合反应所致。如何降低污水中的含油成分、减少聚合反应的生成、防止污水蒸气对塔体材料的腐蚀,是阻垢、除垢和防垢应解决的关键问题。
-
Mainly presents the main quality control elements in delayed coking tower manufacturing process,such as prefabricating,constituting and welding,and presents quality control methods in practical manufacturing procedure,to guarantee the equipment quality to satisfy design and operating requirements.
主要介绍延迟焦化装置焦炭塔的预制、组对、焊接过程中主要质量控制环节,并结合实际介绍了所采取的质量控制措施,通过加强过程控制确保设备制造质量,以满足设计及使用要求。
-
This paper regards Coke Tower delayed coking workshop of JINXI PETRO AND CHEMICAL COMPANY as the research object and accomplished the following content:(1) Checked the age degree and mechanical properties of the Coke Tower and analyzed the metallographic organization and mechanical properties of the coking drum and weld line obtained by checking.
本文以锦西石化分公司延迟焦化车间的焦炭塔为研究对象,重点开展了以下工作:(1)对焦炭塔的老化程度和机械性能进行了检验,对检验得到的塔体和焊缝的金相组织及其机械性能进行了分析。