英语人>词典>英汉 : chimney hood的中文,翻译,解释,例句
chimney hood的中文,翻译,解释,例句

chimney hood

chimney hood的基本解释
-

烟囱帽

相似词
更多 网络例句 与chimney hood相关的网络例句 [注:此内容来源于网络,仅供参考]

My company off the project has: Huaneng Nantong Power Plant chimney painted buoy 214 meters, Huaneng Nanjing Power Plant Boiler steel anti-corrosion, Jinggangshan Huaneng Power Plant chimney repair, the Beijing Coking Plant chimney buoy to improve environmental protection, Dalian TV Tower preservative 180 meters Shanghai Baoshan Iron and Steel Brick Chimney Demolition 55 meters height, Anshan Iron and Steel Company of seven anti-corrosion and repair chimneys, chimney towers Yangzi Petrochemical Company antisepsis, waterproof plugging Taizhou Telecom Tower, Dalian Power Plant cold water tower preservative, Guangdong Textile Ltd. Waterloo BOND Die 80-meter chimney and so on affect the arduous work by the construction units highly.

我公司承担过的工程项目有:华能南通电厂 214 米烟囱涂航标、华能南京电厂锅炉钢架防腐、华能井冈山电厂烟囱的维修、北京焦化厂烟囱环保航标改进,大连电视台 180 米铁塔防腐,上海宝钢 55 米砖烟囱拆除加高、鞍山钢铁公司七个烟囱的防腐和维修、扬子石化公司烟囱水塔防腐、泰州电信大楼防水堵漏、大连发电厂凉水塔防腐、广东奔达纺织有限公司滑模 80 米烟囱等等有影响艰巨工程,受到建设单位的高度评价。

Provinces and cities for many years the company has been appointed as "heavy contract, keep promise" enterprise,"AAA" credit enterprise and the "civilization of advanced unit" on behalf of projects in recent years has Baoqing Heilongjiang Power Plant cooling towers lining anti-corrosion plugging, Jiangsu Suqian power plant 100 m chimney slipform construction, Zhejiang Jiande chimney power plant 120 meters beacon preservative, Zhejiang Xiaoshan Power Company Limited, the main steel frame a new anti-corrosion, Shandong Rip Biochemical Co., Ltd.-owned power plant chimney 60 meters of new, Inner Mongolia Power Company Limited chimney brush color Central, Shaanxi society Cement Co., Ltd., limestone are color plates of the Treasury and the external walls of the installation of anti-corrosion and so on, as enterprises and institutions across the country to solve many difficult engineering construction of the anti-corrosion.

公司连续多年被省市命为&重合同、守信用&企业,& AAA&资信企业和&文明建设先进单位&近年来代表工程有黑龙江宝清热电厂冷却塔内壁防腐堵漏,江苏宿迁电厂100 米烟囱滑模施工,浙江建德热电厂 120 米烟囱航标防腐,浙江萧山新发电有限公司主体钢架防腐,山东瑞普生化有限公司自备电厂 60 米烟囱新建,内蒙古发电有限公司烟囱刷色环,陕西社会水泥有限公司,石灰石均化库彩钢板安装及外墙防腐等,为全国各企事业单位解决了不少高难度修建防腐工程。

Based on the item of national high technology development project, the thesis studies the reasonable construction pattern of the tunnel portal, incidence of the micro-pressure wave and the the effect of bell-mouthed hood, lacunaris hood and expansile hood on alleviating the micro-pressure wave in the situations of single line and double line, obtains the relationship between the max micro-pressure wave and the velocity of the train as well as the relationship between the max micro-pressure wave and distance of measuring point at the velocity of 100km/h-550km/h, compares the different alleviative effect of the three different hood to max micro-pressure wave and finally proposes the reasonable construction pattern of the tunnel portal.

本文针对国家高技术研究发展计划(863计划)课题"磁浮交通沪杭线越黄浦江隧道的工程技术问题研究",在单洞单线和单洞双线两种工况下,对隧道洞口的合理结构形式和影响范围,以及洞口喇叭形入口缓冲段、多孔壁入口缓冲段以及隧道出口膨胀室对减缓微压波的作用进行了研究,得到了磁浮列车速度在100km/h~550km/h时隧道出口微压波最大值与速度的关系以及微压波最大值与测点距离的关系,比较了三种不同形式缓冲结构对微压波最大值的减缓效果,提出了隧道洞口的合理结构形式。