analytic completion
- analytic completion的基本解释
-
-
解析完备
- 更多网络例句与analytic completion相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The post-evaluation of highway construction project goal sustainability is analytic evaluation made after the completion and a period of operation of the project , through analyzing and evaluating for condition of exterior (development of social and economy, management of system and code , condition of highway net , construction of corresponding establishment ) and interiority (system of function , interior management and circumstances of service , charge for highway and the condition of operation), to judge the project of highway operate smoothly or not , and the project have the ability to achieve the target of safety , expeditor , shortcut , higher benefit and lower cost persistently or not .
公路建设项目目标持续性后评价是指公路建设项目在建成通车后一段时间,通过对外部条件(社会经济发展、管理体制与法规、公路网状况、配套设施建设)和内部条件(运行机制、内部管理与服务情况、公路收费及运营状况)等的分析评价,来判断此公路建设项目是否能顺利的持续运营下去,并且和有能力持续实现它安全、通畅、快捷、高效益和低成本这一目标。
- 更多网络解释与analytic completion相关的网络解释 [注:此内容来源于网络,仅供参考]
-
analytic completion:解析开拓
analytic arc 解析弧 | analytic completion 解析开拓 | analytic continuation 解析开拓
-
analytic completion:解析完备
analytic coherent sheaf | 解析凝聚层 | analytic completion | 解析完备 | analytic continuation in the wider sense | 广义解析开拓