allocation of risks
- allocation of risks的基本解释
-
-
[经] 风险分担
- 相似词
- 更多 网络例句 与allocation of risks相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the part of empirical analysis of Chinese IPO first-day return, the difference between existing study and this study is that we use principal components analysis to extract from five factors to construct investors'sentiment index, add it to controled varibles, on which we examine the influence of offering mechanism on IPO first-day return. Moreover, we gather statistics and compare the IPO holding return for lockup period between fixed-price-class offering method and bookbuilding-class offering method, as well as price range between Chinese A-share market and Hongkong stock market, which prvide comprehensive evidence to appraise Chinese IPO bookbuilding mechanism. 2. Compare to the existing literatures which consider discount or allocation, incentive allocation and discount are considered at the same time in optimal mechanism design in this dissertation, and the offering bottom price is introduced to the price range. We investigate the relationship between price range and allocation quantity, and obtain the optimal price range and allocation strategy so that the advantages of independent allocation are reflected. On the other hand, the disadvantages of independent allocation are reflected in the manipulation in case of no restriction on IPO allocation. To distinguish from the existing literatures, bookbuilding mechanism is introduced to the model. We study the allocation strategy adopted by the underwriter in the pooling equilibrium of manipulation. In addition, we analyze the incentive compatibility conditions to which the existence of pooling equilibrium should satisfy and examine some factors'impact on the existence of manipulation.3. In bookbuilding without independent IPO allocation, Chinese realistic IPO background is considered and the condition of bookbuilding and fixed-price hybrid offering is added. Divide bookbuilding and fixed-price hybrid offering into sequential hybrid and simultaneous hybrid, and point out that the key points of subscription strategy in the two kinds of hybrid are different. Through modeling and simulation we obtain the impact of institutional investors'subscription strategy on bookbuilding without independent IPO allocation, which fill the gap in related research. Moreover, in the part of IPO bookbuilding with over-allotment option, the pricing strategy is divided into hot-IPO strategy and weak-IPO strategy. Take into account the procedure of Chinese IPO with over-allotment option, it presents how the underwriter determines the pricing strategy and what effect it brings to offering price and issue size through modeling and simulation. Therefore, it is instructive as a complement to existing literatures.
此外,对我国A股市场询价发行方式与固定价格发行方式下的IPO锁定期到期时持有收益率、以及我国A股市场与香港市场的询价发行价格区间进行了统计比较,为评价我国IPO市场的询价发行提供了比较全面的依据。2、相比已有文献仅考虑折价和分配中的一种激励措施,本论文在有自主配售权下的机制设计中并用了分配与折价两种激励措施,并且在价格区间的制定中引入发行底价,考察了价格区间与分配量之间的关系,得到最优的价格区间和分配策略,从中体现自主分配权的优点;在有自主分配权下的操纵行为研究中则体现了自主配售权的弊端,与已有文献不同的是,在模型中引入了累计投标询价机制,研究了承销商在混同均衡操纵中采取的分配策略,并对操纵存在的条件进行分析讨论,得出各个因素对混同均衡操纵存在的影响。3、在无自主分配权下的询价发行中,充分考虑了我国实际应用的背景,加入了与固定价格发售混合的条件,并将询价与固定价格混合发行分为序贯与同步两种方式,指出机构投资者在两种情况下申购策略的侧重点各有不同,通过对序贯混合发行方式下的网下累计投标策略以及同步混合发行方式下的资金分配策略的模型建立和数值仿真,考察了机构投资者申购策略对无自主分配权下的询价发行的影响,填补了相关研究文献的空白;在包含超额配售选择权的询价发行中,将发行定价策略分为热销策略和弱销策略,在考虑了我国含超额配售选择权的发行流程下,通过建模以及数值仿真得出承销商会对发行定价策略作出怎样的选取,进而会对新股发行价格、发售数量产生怎样的影响,对目前相关研究的缺乏做出了有益的补充。
-
The following factors, among others, could cause actual results and future events to differ materially from those set forth or contemplated in the forward-looking statements: defaults on or non-renewal of leases by tenants or renewal at lower-than-expected rent or failure to lease at all or on favorable terms, decreases in real estate values and impairment losses, increased interest rates and operating costs or greater-than-expected capital expenditures, our failure to obtain, renew or extend necessary financing, re-financing risks, risks related to our obligations in the event of certain defaults under co-investment ventures and other debt, risks related to debt and equity security financings, difficulties in identifying properties to acquire and in effecting acquisitions, our failure to successfully integrate acquired properties and operations, our failure to divest properties we have contracted to sell or to timely reinvest proceeds from any divestitures, our failure to contribute properties to our co-investment ventures, risks and uncertainties affecting property development, value-added conversions, redevelopment and construction (including construction delays, cost overruns, our inability to obtain necessary permits and public opposition to these activities), our failure to qualify and maintain our status as a real estate investment trust, risks related to our tax structuring, failure to maintain our current credit agency ratings or to comply with our debt covenants, environmental uncertainties, risks related to natural disasters, financial market fluctuations, changes in general economic conditions, global trade or in the real estate sector, inflation risks, changes in real estate and zoning laws, a continued or prolonged downturn in the U.S., California or global economy, risks related to doing business internationally and global expansion, risks of opening offices globally, risks of changing personnel and roles, losses in excess of our insurance coverage, unknown liabilities acquired in connection with acquired properties or otherwise and increases in real property tax rates.
以下因素可能会导致实际结果和未来事件与前瞻性陈述产生重大出入:承租人拖欠租金或者不续租;利率以及经营成本的提高;我们未能获得必要的外部融资;再融资的风险;与合资项目和其它债务发生特定违约时我方承担的义务有关的风险;与债务和股权融资有关的风险;确定拟收购的物业以及完成收购过程中遇到的困难;我们未能成功整合收购的物业和业务;我们未能剥离已经签约出售的物业或未能及时将剥离带来的收益再投资;影响物业开发和建设的风险和不确定性(包括建设延期、费用超支、我们无法获得项目建设所需的必要批准以及公众对项目开发建设的反对等);我们无法获得或者维持作为房地产投资信托公司的资质;与我们的税收策划有关的风险;无法保持我们目前的信用评级;环保方面的不确定性;与自然灾害有关的风险;金融市场的波动;整体经济状况或者房地产业的变化;房地产和城市规划法律的调整;美国、加利福尼亚州或者全球经济的衰退;与开展国际业务和全球扩张有关的风险;保险范围之外的损失;与被收购的物业有关的或者其它未知责任以及房地产税率的提高等。我们的成功还依赖于总体经济走向,包括利率、所得税法、政府监管、立法、人口总数变化以及我们在10-K表中作的截至2009年12月31日的季度报告中&风险因素&和其它标题项下阐述的其它问题。
-
In the study on allocation of risks in BOT project, have broken through and is limited to the research in the legal meaning that BOT is practiced, explore the method that BOT project risk shares reasonably and effectively, has designed and set up the mechanism of allocation of risks of BOT project on the system aspect, and has arranged many kinds of measures to different systems, has guaranteed the practicability of this mechanism, have offered the new thinking and method for solving the problem of allocation of risks in BOT project.
在对BOT项目风险分担的研究中,突破了限于BOT实践而在法律意义上的研究,探索BOT项目风险合理、有效分担的方法,在制度层面上设计并建立了BOT项目的风险分担机制,并针对不同的制度安排了多种措施,保证了该机制的实用性,为解决BOT项目风险分担问题提供了新的思路。
- 更多网络解释 与allocation of risks相关的网络解释 [注:此内容来源于网络,仅供参考]
-
allocation of risks:风险分担
allocation and transfer price 调拨价格 | allocation of risks 风险分担 | allocation of well rates 油井配产
-
the allocation and management of risks:风险分担与管理
风险管理和监控:the risks of management and monitor | 风险分担与管理:the allocation and management of risks | 跨国公司理财风险:Financial Management Risks