air conditioning unit
- air conditioning unit的基本解释
-
-
空调设备, 空气调节设备
- 更多网络例句与air conditioning unit相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The project area has three shopping malls in a row not to fight the fire area, with a total length of the circumference of more than 1 / 3, Road fire engines from the inside edge of the wing wall construction materials to highlight the edge of not less than 5.00m, and fire engines to meet the Road Fire The largest car turning radius of 12m, to fight the fire site with a width of 18m, and this is not tall tree planting; and fire fighting facilities of not more than 5% of the slope, fire engines, fire fighting facilities should be able to carry a large set of fire engines Weight; Combined air-conditioning unit: for department stores, supermarkets, large bays, such as the lobby room, a new unit set up wind, ventilation and air return, setting up a new, back to the wind and the proportion of exhaust valve, according to the outdoor temperature of the new regulation, the ratio of air return, Back to the water main unit based PI control valve and in accordance with return air-conditioning temperature valve opening.
本项目商场三个面设有不连续消防扑救面,总长度大于周长的1/3,消防车道内边路缘距建筑外墙突出物边缘不小于5.00m,且消防车道满足消防车最大12m 的转弯半径,消防扑救场地的宽度为18m,且此范围内没有种植高大乔木;此外消防扑救场地的坡度不大于5%,消防车道、消防扑救场地应能承载大型消防车的载重量;组合式空调机组:用于百货商场、超市、大厅等大开间房间,机组设新风、回风及排风,设新、回风及排风比例调节阀,根据室外温度调节新、回风比例,机组回水管设比例积分调节阀并根据回风温度调节水阀开度。
-
This design is the Guangzhou lan west 100 markets summer the central air-conditioning system design, the primary mission completes one, two, three, four buildings load computation; Air-conditioning system plan efficient analysis and water unit's shaping; The air-conditioning system freezing stands design; Four buildings shopping area air conditioning unit's shaping, wind system and aqueous system design; Four buildings work area air blower plate tube system design; And has drawn up four winds tubes floor-plan, the wind side chart, the engine room floor-plan, the aqueous system axis side chart.
本次设计课题是广州市蘭西一百商场夏季中央空调系统设计,主要任务是完成一、二、三、四楼的冷负荷计算;空调系统方案的经济性分析和制冷机组的选型;空调系统冷冻站的设计;四楼购物区空调机组的选型,风系统和水系统的设计;四楼办公区风机盘管系统的设计;并绘制了四层风管平面布置图、风管轴侧图、机房平面布置图,水系统轴侧图。
-
This design is the Guangzhou lan west 100 markets summer the central air-conditioning system design, the primary mission completes one, two, three, four buildings load computation; Air-conditioning system plan efficient analysis and water unit's shaping; The air-conditioning system freezing stands design; Four buildings shopping area air conditioning unit's shaping, wind system and aqueous system design; Four buildings work area air blower plate tube system design; And has drawn up four winds tubes floor-plan, the wind side chart, the engine room floor-plan, the aqueous system axis side chart.
该下载资料由本站会员上传,如果侵犯了您的权力,请通知我们,将立即删除!摘要本次设计课题是广州市蘭西一百商场夏季中央空调系统设计,主要任务是完成一、二、三、四楼的冷负荷计算;空调系统方案的经济性分析和制冷机组的选型;空调系统冷冻站的设计;四楼购物区空调机组的选型,风系统和水系统的设计;四楼办公区风机盘管系统的设计;并绘制了四层风管平面布置图、风管轴侧图、机房平面布置图,水系统轴侧图。
- 更多网络解释与air conditioning unit相关的网络解释 [注:此内容来源于网络,仅供参考]
-
air conditioning load:空调负荷
ahu air hundling unit 空调箱 | air conditioning load空调负荷 | air distribution气流组织
-
air conditioning load:空调负荷 air distribution气流组织
air conditioning load空调负荷 air distribution气流组织 | ahu air hundling unit 空调箱 | air conditioning load空调负荷
-
local air conditioning:局部空调
lithium bromide 溴化锂 | local air conditioning 局部空调 | local air conditioning unit 局部空调机组