Orson Wells
- 相似词
- 更多 网络例句 与Orson Wells相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Methods: 1. To detect the GC level in the serum by enzyme immunoassay kit.The serum samples were obtained from 22 psoriatic patients, 15 patients who had been clinical cured and 20 normal controls. There were standard, control, and sample wells. The standardN control and serum samples were pipeted into the appropriate wells and then the enzyme conjugate solution, GC antiserum were pipeted into each wells, incubated the wells at room temperature for 45 minutes, washed and dried each well, added TMB chromogen solution, incubated the wells for 15 minutes, added H2SO4 to stop the reaction.
1。酶免疫法测定银屑病患者治疗前、后血清GC水平的变化:血清标本来自22例治疗前银屑病患者、15例临床治愈的银屑病患者第四军匝大学硕_],学位论文和 20名正常人对照,设置标准品孔、对照品孔和样本孔,标准品、对照品和血清样品分别加入对应各孔中,在各孔中再加入酶联GC,兔抗GC血清,室温下放置 45分钟后清洗吸干,加 TMP色原,15分钟后 11p。
-
The procedure is applied in two projects:(1) Shanghai Huanqiu finance center tower foundation pit dewatering, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 149m, the horizontal flow barrier goes deep to 34m, the extraction wells are penetrated to 55m, the filters of the extraction wells are located between 34m to 55m, and the water level in the deep foundation pit is decreased to 26m under land surface, the result of 8 pumping wells optimization project is designed.(2) The forth subway of Dong Jia-du tunnel repair foundation pit dewatering in Shanghai, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 144.45m, the horizontal flow barrier goes deep to 65m, the extraction wells are penetrated to 60m, the filters of the extraction wells are located between 45m to 60m, and the water level in the deep foundation pit is decreased to 42.45m under land surface, then an optimization project is designed.
最后将成果分别应用于两个工程实例中:(1)上海环球金融中心塔楼基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达149m、基坑周围挡水连续墙埋深达34m、抽水井埋深达55m、抽水井过滤器埋深为34至55m,基坑内地下水位降至埋深达26m的情况下的地下水复杂流动状态,得出了8口抽水井优化降水方案;(2)上海地铁4号线董家渡隧道修复基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达144.45m、基坑周围挡水连续墙埋深达65m、抽水井埋深达60m、抽水井过滤器埋深为45至60m,基坑内地下水位降至埋深达42.45m的情况下的地下水复杂流动状态,确定出了最优降水方案。
-
In view of the rheological property of the heavy oil in Bo-hai field, this paper deduces the multilateral wells'production model of Non-Newtonian Bingham fluid with equiangular transformation method. In view of the multilateral wells Bo-hai, the paper analyses the multilateral wells'capitalized cost composition, including pre-drilling engineering, drilling engineering, completion engineering and production engineering. It also constructs the multilateral wells'economic benefit models basing on net present value, inner rate of return and payback period.
针对我国渤海油田稠油的流变特性,运用保角变换方法,推导了非牛顿Bingham流体的分支水平井产能模型;针对渤海油田的分支井,从钻前工程、钻井工程、完井工程、采油工程等方面对分支井的投资成本费用构成进行了具体分析;最后以净现值、内部收益率、投资回收期经济评价指标为基础,建立了海上分支井经济效益模型,并根据所建模型应用VB。
- 更多网络解释 与Orson Wells相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Orson Wells:奥森.威尔斯
钱德勒说,大导演奥森.威尔斯(Orson Wells)曾经用过这个办法. 威尔斯是历史上最伟大的一部电影>的导演,还曾根据H.G.威尔斯的小说改编过广播剧>. 乔伊后来就困惑地问钱德勒,最近一次"汉堡王"广告是不是也是这个导演拍的,
-
Orson Wells:奥森.韦尔斯
355a piece of一张(片,块) | 356Orson Wells奥森.韦尔斯 | 357rest room(公共场所或机关内附设盥洗间的)休息室